首页> 外文会议>The International Conference on Management of Technology(2008太原技术管理国际研讨会)论文集 >Innovative Research on Management System of Government Investment Project Based on Whole Life Cycle Cost Theory
【24h】

Innovative Research on Management System of Government Investment Project Based on Whole Life Cycle Cost Theory

机译:基于全生命周期成本理论的政府投资项目管理系统创新研究

获取原文

摘要

On the basis of foreign experiences, an idea is creatively proposed to establish an administration bureau about construction supervision. It interacts with the management of legal person of project construction and the institution who uses the project. They compose a mechanism of construction,management and use. Thus an investigation system about supervision and responsibility is built and perfected. Based on whole life cycle cost theory, government investment projects involve five important stages. By analyzing such stages, it could find that the investment during every stage must be controlled effectively. To improve the investment benefits of government investment projects, summarize experiences and lessons for future projects, contents and methods of post-evaluation are proposed after the investment of government, and some suggestions are put forward. By the innovative research on management system of government investment project, the investment can be controlled, and the pressure of financial investment can be relieved.
机译:在借鉴国外经验的基础上,创造性地提出了建立建设监理局的构想。它与项目建设法人和使用该项目的机构的管理部门进行交互。它们构成了一种构造,管理和使用的机制。从而建立和完善了监督责任追究制度。基于整个生命周期成本理论,政府投资项目涉及五个重要阶段。通过分析这些阶段,可以发现每个阶段的投资都必须得到有效控制。为了提高政府投资项目的投资效益,总结未来项目的经验教训,提出政府投资后的后评价内容和方法,并提出一些建议。通过对政府投资项目管理体制的创新研究,可以控制投资,减轻财政投资的压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号