Research on the Risk Assessment and Countermeasures for the Construction in Lion Ocean Subaqueous Tunnel

机译:狮子海水下隧道施工风险评估与对策研究

获取原文

摘要

There are many great risks in the construction of the subaqueous tunnel. How to control the risks effectively in the construction of tunnels has been a high important task. In order to reduce the probability of risks, it's necessary to research on the risks and countermeasures for the construction in tunnel. The main risk factors in the construction of Lion Ocean were analyzed and identified in this paper. And then these risk factors were assessed and graded by the R=P×C level assessing method. For risk factors was beyond acceptable range, the countermeasures for risks was studied and proposed. The risks level would be acceptable after the countermeasures were actualized. The analysis method and risk countermeasures will be also of great significance to other similar subaqueous tunnel.
机译:水下隧道的建设存在很大的风险。如何有效地控制隧道施工中的风险一直是一项重要的任务。为了降低发生风险的可能性,有必要对隧道施工中的风险及对策进行研究。本文对狮子海建设中的主要危险因素进行了分析和识别。然后通过R = P×C水平评估方法对这些危险因素进行评估和分级。针对风险因素超出可接受范围的问题,研究提出了风险对策。采取对策后,风险水平是可以接受的。分析方法和风险对其他类似的水下隧道也将具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号