首页> 外文会议>Canadian Society for Civil Engineering annual conference >PLANNING OF LOW-INCOME HOUSING PROJECTS USING COMPUTER SIMULATION
【24h】

PLANNING OF LOW-INCOME HOUSING PROJECTS USING COMPUTER SIMULATION

机译:使用计算机模拟规划低收入房屋项目

获取原文

摘要

Construction of low-income housing projects is a replicated process and can be performedusing several construction methods. This paper presents a framework that aids the government agenciesand contractors in the planning of low-cost habitation using computer simulation. The proposedframework estimates the time and cost required for construction of low-income housing. Six constructionmethods can be used in the proposed framework. These are: traditional (cast-in-place), flat slab, prestressed,bearing wall, three dimension structural system, and stay in place form work. The frameworkestimates time and cost of low income housing projects and takes into considerations the uncertaintiesinherited in tasks duration by allowing utilization of several probability density function. A computerprototype, name LIHouse_Sim, is developed in MS Visual Basic 6.0 as a proof of concept for theproposed framework. A case study is presented to demonstrate the use of the developed prototype andto illustrate its essential features.
机译:低收入住房项目的建设是一个重复的过程,可以执行 使用几种构造方法。本文提出了一个有助于政府机构的框架 和承包商使用计算机仿真来规划低成本居住地。建议 该框架估计了建造低收入住房所需的时间和成本。六建设 可以在建议的框架中使用这些方法。这些是:传统(就地浇铸),平板,预应力, 承重墙,三维结构系统,并保持在原位工作。框架 估算低收入住房项目的时间和成本,并考虑不确定性 通过允许使用多个概率密度函数来继承任务持续时间。一台电脑 原型LIHouse_Sim是在MS Visual Basic 6.0中开发的,目的是证明 建议的框架。提出了一个案例研究,以证明所开发的原型的使用以及 来说明其基本功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号