A MATERIAL DISTRIBUTION SCHEDULING FOR RIGGING SHIP-HULL BLOCKS WITH PIPES

机译:用管道索具船体块的材料分布调度

获取原文

摘要

In the precedence rigging of shipbuilding, most of the man-hour of rigging consists of piping work. Therefore it is important how the rigging of pipes is performed efficiently. Currently, all pipes which rigged in the engine room are distributed on the same working space in the target shipyard. There are two problems; One is the distributed pipes occupy a wide space to stock until installation, the other is it takes long time to find target pipes from distributed pipes. We propose a new system which divides the pipes into several groups considering the assembling order that skilled workers adopt. The number of the groups depends on the period of the piping works. Our system enables to reduce the burden of workers, reduce temporary space which placed pipes, and improve efficiency of the piping work. We show a demonstration of the proposed system through simulation using real ships' data.
机译:在造船的优先索具,大多数人的索具由管道工作组成。因此,重要的是如何有效地执行管道的索引。目前,所有管道装有的管道都分布在目标造船厂的相同工作空间上。有两个问题;一个是分布式管道占据宽阔的空间,直到安装,另一个是从分布式管道找到目标管道需要很长时间。我们提出了一个新的系统,将管道划分为几个组,考虑到熟练的工人采用的装配顺序。组的数量取决于管道工作的时期。我们的系统可以减轻工人的负担,减少放置管道的临时空间,提高管道工作的效率。我们通过使用实际船舶数据仿真显示所提出的系统的演示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号