Research on Duration-Cost-Quality Model under Uncertainty in Construction Project Management

机译:工程项目管理中不确定性下的工期成本质量模型研究

获取原文

摘要

Schedule, cost and quality control are main aspects in construction project management. Taking duration, cost and quality into account simultaneously, and keeping the balance among them during the whole process of project management are significant for the improvement of the overall benefits of construction project. In general, there is a trade-off between duration, cost and quality to complete a project. On basis of analyzing the relationship of duration, cost and quality, this paper establishes duration-cost model and duration-quality model which considering of uncertainty in construction project management. And a case study is given to verify the feasibility and practicability of the model. It provides scientific basis for project decision-making.
机译:进度,成本和质量控制是建设项目管理的主要方面。同时考虑工期,成本和质量,并在项目管理的整个过程中保持两者之间的平衡,对于提高建设项目的整体效益具有重要意义。通常,要完成一个项目,需要在持续时间,成本和质量之间进行权衡。在分析工期,成本和质量的关系的基础上,建立了考虑工程项目管理不确定性的工期成本模型和工期质量模型。并通过案例研究验证了该模型的可行性和实用性。它为项目决策提供科学依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号