Research on the Black Start Field Test of Shandong Power Grid Based on PDCA Cycle

机译:基于PDCA循环的山东电网黑启动实验研究。

获取原文

摘要

Due to the lack of effective mechanism of black start experiment with continuous improvement in power system, the black start experiment management of PDCA mode is proposed according to the risk management mechanism, accident priority control and continuous improvement implementation principles. Shangdong power grid black start experiment is implemented successfully with the standardization management. In the Planning stage during implementation of PDCA cycle management, three risk factors including abnormal parameters of the pumped-storage unit with low load, DC power shortage for breaks and issues of synchronism parallel operation are early detected and eliminated through rectification with several phases. In the Doing stage, test is implemented with four steps including adjustment of operation mode, shutdown of units, black start test and restoration of subsystem. Time is controlled accurately during test procedure. In the Checking stage, the black start ability of pumped-storage unit and large thermal power unit is analyzed with recording data of test. Test objectives are fully verified. In the Action stage, prior schemes of black start are revised. Test plan and dispatching operation are developed for the next cycle. Following the PDCA pattern, the high-risk large-cost experiment involving wide scopes realizes the closed-loop management with feedforward control, concurrent control and feedback control. It effectively guarantees the smooth implementation of the experiment. Moreover, the continuous improvement action promotes black start capabilities to be more in line with actual requirements.
机译:针对电力系统黑启动实验缺乏有效机制和持续改进的问题,根据风险管理机制,事故优先级控制和持续改进实施原则,提出了PDCA模式的黑启动实验管理。山东电网黑启动实验已成功实施标准化管理。在实施PDCA周期管理的规划阶段,通过多阶段的纠正,可以尽早发现并消除三个风险因素,包括低负载抽水式存储单元的参数异常,直流电断路和同步并联运行问题。在Doing阶段,测试通过四个步骤实施,包括调整操作模式,关闭设备,黑启动测试和子系统恢复。在测试过程中可以精确地控制时间。在检查阶段,利用测试记录数据分析抽水蓄能机组和大型火电机组的黑启动能力。测试目标已得到充分验证。在行动阶段,对先前的黑启动方案进行了修改。将为下一个周期制定测试计划和调度操作。遵循PDCA模式,涉及范围广泛的高风险大成本实验通过前馈控制,并发控制和反馈控制来实现闭环管理。它有效地保证了实验的顺利进行。而且,持续改进措施使黑启动能力更符合实际要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号