Flood Hazards from Impoundment Failure in Nuclear Power Plant Sites

机译:核电厂厂址蓄水失败的洪水危险

获取原文

摘要

As part of the Combined License or Early Site Permit application process for new nuclear power facilities in the US, detailed flood hazard evaluations are required to support the site safety analysis report. Dam failures are one of the flooding events that have to be considered in accordance with the nuclear regulatory requirements. The dams and impoundment facilities postulated to fail could be located on site or upstream of the site. This paper discusses the modeling approaches and methods used in analyzing the flooding resulting from the failure of water impoundment facilities onsite or near the site. In particular, the antecedent conditions, the solution methods and boundary conditions of a 2-dimensional breach model are discussed.
机译:作为美国新核电设施的联合许可或早期现场许可申请程序的一部分,需要进行详细的洪水危害评估,以支持现场安全分析报告。大坝故障是必须根据核监管要求考虑的洪水事件之一。假定失败的水坝和蓄水设施可以位于现场或现场上游。本文讨论了用于分析现场或附近水库设施故障造成的洪水的建模方法和方法。特别讨论了二维违规模型的先决条件,求解方法和边界条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号