Discussion on issues of engineering alteration and construction claim

机译:关于工程变更和施工索赔问题的讨论

获取原文

摘要

In the civil and hydroelectric engineering management, engineering variations are always solved by the way of construction claim compensation, which no doubt increases the difficulty of the claim. In this paper, through definition of engineering changes and construction claims, and discriminating analysis of their processing program and mode of payment, it is presented that contractor should use the clause of engineering alteration rationally. Defects of drawing and technical specification, changes of owner's require and strict inspection and inappropriate refuse of engineers should be listed in engineering alteration, try to make it legalization. In the end, an example is taken to illustrate the effect, which makes the contractor gain more benefit and decrease less loss.
机译:在民用和水力发电工程管理中,工程变异始终通过施工索赔赔偿的方式解决,无疑会增加索赔的难度。本文通过工程变更和施工索赔的定义,以及对其加工计划和付款方式的鉴别分析,提出了承包商应合理地使用工程改革的条款。绘画和技术规范的缺陷,所有者需要的变化以及严格的检查和不合适的工程师拒绝应列入工程改革,尽量使其合法化。最后,采用一个例子来说明效果,这使得承包商增加了更多的利益和减少损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号