首页> 外文会议>2011 19th Iranian Conference on Electrical Engineering >Simultaneous scheduling of energy spinning reserve considering customer and supplier choice on reliability
【24h】

Simultaneous scheduling of energy spinning reserve considering customer and supplier choice on reliability

机译:同时考虑客户和供应商对可靠性的考虑,同时安排能源和纺纱储备

获取原文

摘要

In this paper, a new model is proposed for simultaneous clearing of energy and reserve market considering generation deficiencies and transmission constraints where the reserve capacity is scheduled based on the desired risk level of customers and suppliers, that is recognized by the expected load not supplied (ELNS) index and expected power not served (EPNS) criterion. Also, the required reserve allocated to generators is calculated separately, i.e., part of reserve is allocated to generation deficiencies and the rest of it is considered for transmission restrictions. Therefore, this method produces market-clearing results with the desired probabilistic characteristics. For illustrating the efficiency of proposed technique, it is applied to the Roy Billinton test system (RBTS) and results are analyzed.
机译:本文提出了一种新模型,该模型同时考虑了发电缺陷和传输约束,同时清理能源和储备市场,在这种模型中,储备容量是根据客户和供应商的期望风险水平进行调度的,这可以通过未供应的预期负荷来识别( ELNS)指标和预期不到服务功率(EPNS)准则。同样,分配给发电机的所需备用量是分开计算的,即,备用量的一部分分配给了发电缺陷,其余的考虑用于传输限制。因此,此方法产生具有所需概率特征的市场清算结果。为了说明所提出技术的效率,将其应用于Roy Billinton测试系统(RBTS)并分析了结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号