首页> 外文会议>International conference on pipelines and trenchless technology;ICPTT 2011 >Insight into Some Aspects of Pipe Jacking Techniques during Long Distance Installations in Municipal Engineering
【24h】

Insight into Some Aspects of Pipe Jacking Techniques during Long Distance Installations in Municipal Engineering

机译:对市政工程中长距离安装过程中顶管技术的某些方面的认识

获取原文

摘要

With the increasingly widespread in the application of municipal projects with unparalleled advantages, pipe jacking construction technology during long distance is one of the most complex and quite difficult topics. The technical problems and measures to deal with that through of the pipe jacking technology during long distance were provided in this paper, including (l)appropriate construction methods were selected in accordance with comparative analysis and verification, (2)common problems, such as rotation of the jacking machine, correction, slurry leakage and ventilation, were handled with effective management and treated timely with frequent small adjustments instead of static or large ones, (3)measures were taken to prevent major technical problems such as insufficient jacking force, insufficient thrust force from working shaft and failure in following correct jacking direction. Integration of meticulous organization and information construction can be widely applied in the city's infrastructure.
机译:随着具有无与伦比的优势的市政项目应用的日益广泛,长距离顶管施工技术是最复杂,最困难的主题之一。提出了解决长距离顶管技术所遇到的技术问题和措施,包括(l)通过比较分析和验证选择了合适的施工方法,(2)旋转等常见问题。顶升机的矫正,泥浆泄漏和通风等得到有效管理,并及时进行小幅调整,而不是静态或大的调整。(3)采取措施,防止顶升力不足,推力不足等重大技术问题。来自工作轴的力和沿正确的顶进方向的故障。细致的组织和信息建设的整合可以广泛地应用在城市的基础设施中。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号