首页> 外文会议>Pipeline conference;Pipelines 2011 >MITIGATING GEOHAZARDS ALONG AGING INFRASTRUCTURE - THE TOLT PIPELINE
【24h】

MITIGATING GEOHAZARDS ALONG AGING INFRASTRUCTURE - THE TOLT PIPELINE

机译:延缓基础设施老化的地质灾害-TOLT管道

获取原文

摘要

Seattle Public Utilities (SPU) in Washington State owns and operates two major water supply pipelines extending from the Tolt Reservoir in the foothills of the Cascade Mountain Range to the City of Seattle. These pipelines measure about 56 kilometers (km) in length and supply the City with about 30 percent of its water supply. The first pipe, designated Tolt Pipeline 1 (TPL1), is a 1.7-meter (m) diameter, concrete cylinder pipeline that was constructed in 1960. The second pipe, designated Tolt Pipeline 2 (TPL2), is a 2.3-m diameter, steel pipeline that was constructed in 1998. TPL2 was field mortar lined and is tape coated. Together they are referred to as the Tolt Pipeline. Since 2000, SPU has documented slope movements starting with ground surface tension cracks along a 150-m long stretch of the Tolt Pipeline. Within this stretch, the pipelines are buried about 1 to 3 m below a paved roadway surface. According to geologic and LiDAR (Light Detection and Ranging) mapping, the pipelines are located within a large, ancient landslide complex. Various studies and mitigation measures have been implemented since 2000, and currently SPU is evaluating additional mitigation measures due to continuing slope movements.
机译:华盛顿州的西雅图公用事业公司(SPU)拥有并运营两条主要的供水管道,从卡斯卡特山脉脚下的托特水库到西雅图市。这些管道长约56公里,为纽约市供水约30%。第一条管道称为Tolt管道1(TPL1),直径为1.7米(m),建于1960年。第二条管道名为Tolt管道2(TPL2),直径为2.3米,于1998年建造的钢制管道。TPL2现场用砂浆衬砌,并采用胶带涂层。它们一起被称为Tolt管道。自2000年以来,SPU记录了沿Tolt管道长150 m的地表张力裂缝开始的斜坡运动。在这段时间内,管道被埋在铺好的路面下方约1至3 m。根据地质和LiDAR(光探测与测距)制图,管道位于一个大型的古老滑坡复合体中。自2000年以来,已经进行了各种研究和缓解措施,并且由于坡度的持续移动,SPU目前正在评估其他缓解措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号