首页> 外文会议>Conference on modern technologies in space- and ground-based telescopes and instrumentation II >Architecture impacts on planning and activity scheduling in external occulter missions
【24h】

Architecture impacts on planning and activity scheduling in external occulter missions

机译:体系结构对外部掩星任务的计划和活动安排的影响

获取原文

摘要

Architecture choices impact planning and scheduling of activity sequences for two widely separated spacecraftenvisioned to be part of an astrophysics mission to observe extra-solar-planets. The two spacecraft consist of a largespace telescope and an external occulter, separated by tens of thousands of kilometres. The science need is to maintainalignment at the tens of milliarcseconds level (~ metres) or less on given target stars after moving one of the spacecrafttens of thousands of kilometres. Doing this efficiently presents operational and architectural design challenges that relyon appropriate choice of navigation, propulsion, and alignment technologies, vehicle configuration, and activityscheduling strategies—an extensive combination of which may potentially be chosen from for such a mission.Challenges inherent in the general system architecture are described with emphasis on potential problems and the needfor sound and appropriate integration of architecture planning, subsystem choice, and activity scheduling.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
机译:架构的选择会影响到两个相距遥远的航天器的活动序列的计划和安排,这些航天器被设想为观测太阳系外行星的天体物理学任务的一部分。这两个航天器由一个大望远镜和一个外部掩星器组成,相隔数万公里。科学上的需求是,在移动了数千公里的航天器之一之后,将给定目标恒星的对准保持在数十毫秒或以下的水平。这样做有效地呈现业务和建筑设计挑战Relyon牌适当选择导航,推进,和对准技术,车辆的配置,和activityscheduling策略-一个广泛的组合都可能潜在地从在一般系统中固有这种mission.Challenges被选择在描述架构时,重点关注潜在问题以及对架构规划,子系统选择和活动计划进行合理,适当集成的需要。©(2012)COPYRIGHT光电仪器工程师协会(SPIE)。摘要的下载仅允许个人使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号