【24h】

EXECUTING A TRAPEZOIDAL CSG DAM

机译:执行梯形CSG DAM

获取原文

摘要

A trapezoidal CGS dam, which is a new type of dam developed in Japan to reduce the use of materials, also helps to rationalize design and execution. To date, it has been studied as a method for supplementary structures such as the marsh control works of the Taiho Dam, the Kawai sub-dam at the Haizuka Dam, and the secondary dam at the Kasegawa Dam. In 2009, work began on placing the dam body of the Tobetsu Dam, the first trapezoidal CSG dam, and the placing was completed in December 2010. Placing of CSG for the Okukubi Dam started in November 2010 and is scheduled to be completed in September 2011. This paper describes the execution and quality control of the trapezoidal CSG dam, with reference to the Tobetsu Dam as an example.
机译:梯形CGS大坝是日本开发的一种新型大坝 减少材料的使用,也有助于合理化设计和执行。到 迄今为止,已经作为一种补充结构的方法进行了研究,例如 Taizu大坝,Haizuka大坝的Kawai子大坝的沼泽控制工程, 以及长谷川大坝的二级大坝。从2009年开始, Tobetsu大坝的坝体,第一个梯形CSG大坝以及布置 于2010年12月完成。 2010年11月,计划于2011年9月完成。本文 描述了梯形CSG大坝的执行和质量控制, 以Tobetsu大坝为例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号