REDEVELOPMENT OF TSURUDA DAM

机译:Tsuru Da M的Redee P Men T

获取原文

摘要

The Tsuruda Dam, a concrete gravity dam with height of 117.5m located in the middle reaches of the Sendaigawa River, was constructed as a multi-purpose dam to control flooding and generate electric power. The dam was completed in 1966, but in July 2006, record-breaking torrential rain fell in the Sendaigawa River basin, where it caused severe flood damage. The Tsuruda Dam controlled the flood, playing a major role in mitigating the flood damage, but the scale of the flood greatly exceeded the original plan, so it was impossible to adequately prevent flood damage. Therefore, a redevelopment project was planned.
机译:鹤田水坝是位于仙台川河中游的高度为117.5m的混凝土重力坝,被用作控制洪水和发电的多功能水坝。该水坝于1966年完工,但在2006年7月,仙台川流域的暴雨打破了纪录,造成了严重的洪灾。鹤田大坝控制了洪水,在减轻洪水灾害中发挥了重要作用,但是洪水的规模大大超出了原计划,因此无法充分预防洪水灾害。因此,计划了一个重建项目。