首页> 外文会议>International congress on large dams;International Commission on Large Dams >PLANNING, DESIGN AND OPERATION FOR ENVIRONMENTAL RELEASES FROM BERG RIVER DAM
【24h】

PLANNING, DESIGN AND OPERATION FOR ENVIRONMENTAL RELEASES FROM BERG RIVER DAM

机译:伯格河大坝环境释放的规划,设计和运营

获取原文

摘要

The Berg River Dam is located on the Berg River in the Western Cape Province of South Africa. It is a 61 m high concrete faced rockfill Dam with a storage capacity of 130 million m~3 and was completed in 2008.The South African National Water Act of 1998 mandates that all new dams designed, constructed and operated in South Africa must provide for the environmental flow requirements of downstream ecosystems in accordance with a specified environmental Reserve. The Berg Water Project is a landmark project comprising the Berg River Dam and the Supplement Scheme, which pumps downstream flows back into the Dam during the winter months. The environmental Reserve determined for the Dam prescribes low and high flow releases as well as the quality of water to be released.
机译:伯格河大坝位于西开普省的伯格河上 南非省。这是一个高61 m的混凝土面板堆石坝,带有一个 仓库容量达1.3亿立方米,并于2008年完成。 1998年的《南非国家水法》要求所有新水坝 在南非设计,建造和运营的产品必须提供 符合下游生态系统的环境流量要求 指定的环境储备。伯格水项目是一个具有里程碑意义的项目 包括伯格河水坝和补给计划, 在冬季,下游流回大坝。这 大坝确定的环境储备规定了高流量和低流量 释放以及要释放的水的质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号