The Son La Hydropower Plant Project is located at the Da River in northwest Vietnam. The total installed capacity of the Project is 2,400 MW and the expected annual energy production is 10,246 GWh. The Project is aimed at power generation, flood control and water supply, and socio-economic development. The dam is of the concrete gravity type of 138 m in maximum height and 962 m in crest length, and was constructed with RCC (roller compacted concrete) and CVC (conventional vibratable concrete). The spillway is a gated open type, with surface and bottom gates for a design discharge of 38,200 m~3/s. The power intake and waterway were constructed for six lanes of penstock in and on the dam. The powerhouse at the toe of the dam is an open type, which houses six units of Francis turbines of 400 MW capacity. The volumes of RCC and CVC placed for the Project were 2.7 million m~3 and 2.1 million m~3, respectively. Construction in the Project was commenced in March 2004 and the commercial operations of the first unit of 400 MW capacity were successfully started in December 2010.
机译:松拉水电站项目位于越南西北部的达河。该项目的总装机容量为2,400兆瓦,预计年发电量为10,246吉瓦时。该项目的目标是发电,防洪和供水以及社会经济发展。该坝为混凝土重力型,最大高度为138 m,拱顶长度为962 m,由RCC(碾压混凝土)和CVC(传统可振捣混凝土)建造。溢洪道为闸门开放式,具有表面闸门和底部闸门,设计流量为38,200 m〜3 / s。进水口和水路是为大坝内外的六个压力管道建造的。大坝脚趾处的发电站是开放式的,可容纳6台容量为400兆瓦的弗朗西斯涡轮机。该项目的RCC和CVC量分别为270万立方米和210万立方米。该项目的建设于2004年3月开始,第一台400 MW机组的商业运营已于2010年12月成功开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号