首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Fuzzy decision model for construction contractor's selection in Egypt: Tender phase
【24h】

Fuzzy decision model for construction contractor's selection in Egypt: Tender phase

机译:埃及建筑承包商选择的模糊决策模型:招标阶段

获取原文

摘要

Selecting an appropriate contractor is essential for the success of any construction project. A tender procedure should facilitate selection of a reliable contractor taking into consideration many criteria. This paper presents a systematic prequalification and performance procedure, based on multi criteria decision making (MCDM) that is Analytical Hierarchy Process (AHP) with Fuzzy Set Theory. This process uses an algorithm to handle the inconsistencies in the fuzzy preference relation when pair-wise comparison judgments are used with linguistic assessment or exact assessment of performance of the contractors on qualitative or quantitative criterion, respectively. A questionnaire survey was conducted, containing 34 factors affecting cost estimation for contractor selection during tender decision. Finally, a real case study and an application example for a contractor selection problem were provided to the construction industry to demonstrate the implementation process of the proposed method.
机译:选择合适的承包商对于任何建设项目的成功都是至关重要的。考虑到许多标准,招标程序应有助于选择可靠的承包商。本文提出了一种基于多准则决策(MCDM)的系统的资格预审和绩效程序,该决策是基于模糊集理论的层次分析法(AHP)。当成对比较判断分别用于定性或定量标准的承包商的语言评估或绩效评估时,此过程使用一种算法来处理模糊偏好关系中的不一致。进行了问卷调查,其中包含34个影响投标决策过程中承包商选择成本估算的因素。最后,为建筑业提供了一个案例研究和承包商选择问题的应用实例,以说明该方法的实施过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号