Monitoring analysis on the internal action of Pile-Beam-Anchor support system of T2 Pit of Wangjing SOHO

机译:王金山T2桩桩锚锚固系统内部作用监测分析

获取原文

摘要

Based on the stress tests of soldier Piles, ring Beam and Anchor tiebacks (PBA), and the hole displacement observation on Wangjing Soho construction site, the development process of the internal force caused by spatial member interaction has been revealed. It reflects the differences from mechanic principals of the traditional design method such as elastic foundation beam or equivalence beam of limit equilibrium state. Practical tests showed that soldier pile were under the combination state of compression and bending, and were proved safe because of low stress; while the top ring beam was under the combination state of tension and bending, and the tensile stress might come to the elastic stress limit, which has much relationship to the anchor arrangement, so the design of top ring beam should be regarded as one of the key control of the construction. The actual tested tieback tensile force reached 150~220KN, only the half of the design value.
机译:基于士兵桩,环形梁和锚固重件(PBA)的压力测试,以及王金山施工现场的孔位移观察,已经揭示了空间构件相互作用引起的内部力的开发过程。它反映了传统设计方法的机械原理的差异,如弹性基梁或极限平衡状态的等效光束。实际测试表明,士兵桩在压缩和弯曲的组合状态下,由于低应力而被证明是安全的;虽然顶部环梁在张力和弯曲的组合状态下,并且拉伸应力可能会达到弹性应力极限,这与锚固装置具有很大的关系,因此顶环光束的设计应该被视为其中一个施工的关键控制。实际测试的卷起拉伸力达到150〜220kN,只有一半的设计价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号