Challenges with Designing a Potable Water Transmission Pipeline across the Navajo Reservation

机译:在纳瓦霍预订中设计饮用水输送管道的挑战

获取原文

摘要

The Navajo-Gallup Water Supply Project (NGWSP) is a major infrastructure endeavor that will convey a reliable municipal and industrial water supply for future generations on Navajo Nation land and the Four Corners Region. The project will service northwest New Mexico, including the eastern section of the Navajo Nation, the southwestern portion of the Jicarilla Apache Nation (JAN), and the city of Gallup (COG) via approximately 300 miles of pipeline, 19 pumping plants, and 2 water treatment plants. The pipeline will cross various land ownership types (tribal, state, private, and federal) with different regulatory agencies, and unclear jurisdictional boundaries presenting many obstacles for alignment consideration. Additionally, highly corrosive soils and wash crossings influence the pipe material selection while preserving environmental and cultural resources. Public outreach is vital toward earning the public's buy-in through education of the residents, informing them of the project's progress. The NGWSP has a congressionally-mandated deadline for completion by December 31, 2024.
机译:Navajo-Gallup供水项目(NGWSP)是一个主要的基础设施努力,将为纳瓦霍国家土地和四个角落地区的后代传达可靠的市政和工业供水。该项目将为新墨西哥州西北部提供服务,包括Navajo国家的东部,JiCarilla Apache Nation(Jan)的西南部,以及通过大约300英里的管道,19辆抽水厂和2辆盖洛普(Cog)。水处理厂。管道将通过不同的监管机构交叉各种土地所有权类型(部落,州,私人和联邦),并不清楚介绍对准审议的许多障碍的司法管辖权界限。此外,高度腐蚀性的土壤和洗涤交叉会影响管材选择,同时保持环境和文化资源。通过居民的教育,公众外展对公众的买入,致力于居民的推广至关重要,告知他们项目的进展情况。 NGWSP在2024年12月31日之前的完成截止日期为期截止日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号