Integrating BIM and Project Schedule Information Using Semantic Web Technology

机译:使用语义网技术集成BIM和项目进度信息

获取原文

摘要

A construction project requires collaboration of a large number of individuals working in different organizations to deliver the project on time and within the budget. Architecture, engineering, and construction industry spends time and money to solve the information sharing and interoperability issues between different domains. With the advent of building information modeling, a 3D CAD model of a project is used as a shared knowledge resource during the design, construction, and facility management phases of a project's life cycle. Currently, 4D models are created by combining CAD and schedule information. A 4D model is useful for detecting potential construction conflicts during the project planning and design and a valuable tool during construction. However, creating 4D models requires a great amount of human involvement. An approach that facilitates integrating BIM and schedule information can improve efficiency and is highly desirable. This paper presents a new approach to information modeling using the Semantic Web technology. The Semantic Web provides an infrastructure and a data modeling format that allows computers to access and combine information distributed over the Internet. The paper discusses: (1) ontologies that the authors have developed for BIM and project schedule information; (2) how ontologies are used for creating project knowledge bases in RDF/OWL format; and (3) how project knowledge bases can facilitate machine processing of project information and semantic interoperability among project knowledge bases. The Semantic Web approach allows information to be saved once at the provider source and be used by authorized users as needed. This means BIM information is created and maintained by designers and project schedule is created and maintained by schedulers on their respective servers. This would allow the latest BIM and project schedule information to be accessed over the Internet and combined for various purposes.
机译:建设项目需要大量在不同组织中工作的个人的协作,以在预算范围内按时交付项目。建筑,工程和建筑行业花费时间和金钱来解决不同域之间的信息共享和互操作性问题。随着建筑信息模型的出现,在项目生命周期的设计,建造和设施管理阶段,将项目的3D CAD模型用作共享的知识资源。当前,通过结合CAD和计划信息来创建4D模型。 4D模型对于在项目计划和设计过程中检测潜在的施工冲突非常有用,并且在施工过程中是一种有价值的工具。但是,创建4D模型需要大量人员参与。有助于集成BIM和计划信息的方法可以提高效率,这是非常需要的。本文提出了一种使用语义网技术进行信息建模的新方法。语义Web提供了基础结构和数据建模格式,该格式和格式允许计算机访问和组合通过Internet分发的信息。本文讨论:(1)作者为BIM和项目进度信息开发的本体; (2)如何使用本体创建RDF / OWL格式的项目知识库; (3)项目知识库如何促进项目信息的机器处理以及项目知识库之间的语义互操作性。语义Web方法允许信息在提供者源处保存一次,并由授权用户根据需要使用。这意味着BIM信息是由设计人员创建和维护的,而项目计划是由调度程序在其各自的服务器上创建和维护的。这将允许通过Internet访问最新的BIM和项目进度表信息,并将其组合以用于各种目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号