首页> 外文会议>Pipelines conference >Making Way for the Ho Chi Minh City Subway While Avoiding Suspension of Financial District Activities by Use of Triple Plugging and Bypasses
【24h】

Making Way for the Ho Chi Minh City Subway While Avoiding Suspension of Financial District Activities by Use of Triple Plugging and Bypasses

机译:通过使用三重堵塞和旁路避免胡乱中止金融区活动的胡志明市地铁路

获取原文

摘要

Ho Chi Min City, the largest city and economic hub of Vietnam, has been growing at a rate that, among other things, has created traffic congestion that brings traffic flow in some sectors of the city to a virtual halt during peak demand hours. For this reason the City Council, with the goal of improving environmental and economic conditions, is building a subway system as part of its plan to promote sustainable and safe modes of transport. In order to accomplish this improvement it was necessary to relocate a 48 inch diameter water transmission line in the main financial district of the city to enable subway construction. This paper will discuss meeting the challenges of performing a triple plugging and bypass operation for the relocation of the 48 inch transmission line, while avoiding shutting down the city's financial district, thereby contributing to the completion of the transportation improvement plan. The challenges, among others, included: organizing, planning and controlling the project; managing and executing operations across a global organization while interfacing with a complex owner organization in order to successfully implement and perform the tapping and plugging procedure.
机译:胡志明市是越南最大的城市和经济中心,其发展速度不仅导致交通拥堵,还导致该市某些地区的交通流量在需求高峰时段基本停滞。因此,市议会为了改善环境和经济条件,正在建设地铁系统,作为其计划的一部分,以促进可持续和安全的交通方式。为了实现这一改进,有必要在城市的主要金融区搬迁一条直径为48英寸的输水线,以实现地铁建设。本文将讨论如何应对48英寸传输线的迁移进行三重堵塞和旁路操作的挑战,同时避免关闭城市的金融区,从而为完成交通改善计划做出贡献。其中的挑战包括:组织,计划和控制项目;在与复杂的所有者组织对接的同时管理和执行全球组织中的操作,以成功实施和执行窃听和插入程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号