Fast Tracking the Pulau Poh Cable-stayed Bridge

机译:快速追踪Pulau Poh斜拉桥

获取原文

摘要

The construction of the Pulau Poh cable-stayed bridge has been challenging both technically and environmentally. The curved pylon shape in two planes, with changing cross section and heavily congested reinforcement pose constructability concerns. Accurate geometry control and positioning of stay cable anchorages within the pylon is crucial to ensure the bridge meets its intended design life. Located in an area with high rainfall intensity presents additional environmental challenges, where working areas are constantly submerged. To address the challenges and meet the project deadline, innovative construction methodologies are being adopted. The bridge design was also revisited, taking into consideration the construction approach. This paper aims to explain the challenges faced and methods used to fast track the construction of the Pulau Poh cable-stayed bridge.
机译:Pulau Poh斜拉桥的建造在技术和环境方面都面临着挑战。在两个平面中弯曲的塔形形状,不断变化的横截面和严重拥挤的钢筋构成了可施工性问题。精确的几何形状控制和斜拉索在塔架内的定位对于确保桥达到预期的设计寿命至关重要。坐落在降雨强度高的区域带来了额外的环境挑战,工作区域经常被淹没。为了应对挑战并在项目截止日期之前完成,正在采用创新的施工方法。考虑到施工方法,还重新考虑了桥梁设计。本文旨在解释面临的挑战和快速追踪Pulau Poh斜拉桥施工的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号