Kaombo Start-Up Strategy: Together We Throve!

机译:Kaombo创业策略:我们齐心协力!

获取原文

摘要

The FPSO Kaombo Norte came on stream on July 27th offshore Angola. When both its FPSOs will be at plateau, Kaombo, the biggest deep offshore project in Angola will account for 15% of the country's oil production. It produces light oil from six fields scattered over an 800-square-kilometer area. Gindungo, Gengibre, and Caril fields are connected to the Norte FPSO while Mostarda, Canela, and Louro fields will be producing on FPSO Sul. The full development stands out for its subsea network size with more than 300 kilometers of lines on the seabed within 1500-2000m water depth, including subsea production wells more than 25km away from the production facility. In order to secure a safe First-Oil and to smoothly start-up the production, a detailed and cross-functional study was carried out. The first step was to start from a clean slate by forgetting all previous startup scenarios: the three loops candidate to start-up hydrocarbon production were re-analyzed in depth to evaluate strengths and weaknesses. A task force composed of all involved disciplines, including contractors, was put in place in order to apply a cross-functional approach. Constraints from reservoir up to topsides were analyzed providing an overall picture and clear ranking to develop the start-up strategy. An ambitious planning of the commissioning activities combined with a relatively short-term reservoir management were crucial to lock production loop priorities with water injection and gas export systems readiness. The work jointly performed contributed to serene environment for a safe start-up and ramp-up. Following the assessment, decision was made to start first the most "powerful" reservoir despite a challenging flowline. The relatively high initial pressure and oil undersaturation, the robust open-hole gravel-pack completions and high productivity wells were beneficial to stabilize the multiphase flow in the subsea network. Improvement of the production was rapidly made with the start-up of the second production loop only fifteen days after. Postponement of the water injection system and the availability of the riser base gas lift were judiciously calculated: the readiness of these systems arrived in due time to respectively slow down the natural depletion of the reservoirs and improve the wells eruptivity and stability of the flowlines. Our capacity to re-invent ourselves and leave behind individual priorities conducted to a collective success captured in the outstanding production levels since early days of field life.
机译:FPSO Kaombo Norte于7月27日在安哥拉近海投产。当两个FPSO都位于高原地区的Kaombo时,安哥拉最大的深海海上项目将占该国石油产量的15%。它从散布在800平方公里面积上的六个油田生产轻油。 Gindungo,Gengibre和Caril气田与Norte FPSO连接,而Mostarda,Canela和Louro气田将在FPSO Sul上生产。完整的开发项目因其海底网络规模而著称,在1500-2000m的水深范围内,海底管道超过300公里,其中包括距生产设施25公里以上的海底生产井。为了确保安全的第一油并顺利启动生产,我们进行了详细的跨职能研究。第一步是通过忘记所有以前的启动方案从干净的表象开始:对重新启动碳氢化合物生产的三个循环候选方案进行了深度分析,以评估优缺点。为了实施跨职能方法,成立了一个由包括承包商在内的所有相关学科组成的工作队。分析了从储层到顶部的约束条件,从而提供了总体情况和明确的排名,以制定启动策略。雄心勃勃的调试活动计划与相对短期的储层管理相结合,对于锁定注水和输气系统的生产环路优先级至关重要。共同执行的工作为安全启动和加速提供了宁静的环境。经过评估,尽管输油管线充满挑战,但还是决定首先启动最“强大”的油藏。相对较高的初始压力和油饱和度不足,坚固的裸眼砾石充填完井性和高产井,对于稳定海底网络中的多相流是有利的。仅在15天后启动第二个生产循环,就迅速改善了生产。明智地计算了注水系统的延期和立管基础气举的可用性:这些系统已准备就绪,可以在适当的时候到达,以分别减缓油藏的自然枯竭速度并改善油井的喷发性和输油管的稳定性。自从田野生活的早期开始,我们就拥有了重塑自我并摆脱个人优先事项的能力,从而在出色的生产水平中取得了集体成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号