首页> 外文会议>Production operation symposium >Water shutoff through fullbore placement of polymer gel in faulted and in hydraulically fractured producers of the prudhoe bay field
【24h】

Water shutoff through fullbore placement of polymer gel in faulted and in hydraulically fractured producers of the prudhoe bay field

机译:通过在Prudhoe Bay领域的故障和液压碎片生产商中富有聚合物凝胶的含水截止

获取原文

摘要

Selective shoutoff of undesired water influx by nonselective (fullbore) placement of treating chemicals has been successfully demonstreated in production wells of teh Prudhoe Bay field. This was accomplished through: (1) careful choice of candidates with known high conductivity water influx pathways (fault, hydraulic fracture, thief), (2) placement that exploited conductivity differences without zonal isolation, and (3) use of established polymer gel chemistry with previously demonstrated ability to shut off water preferentially to oil.
机译:在Prudhoe Bay田野的生产井上成功地解释了NONEERCENCERIVE(HULTBORE)放置化学品的选择性水涌入的选择性呼啸。这是通过的:(1)仔细选择具有已知的高导电性水流入路径(故障,液压断裂,小偷),(2)放置的候选者,该展示位置利用无区间隔离的导电差异,以及(3)使用已建立的聚合物凝胶化学物质以前证明了优先关闭水的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号