【24h】

STRATEGY OF FLOOD CONTROL IN TAIHU BASIN

机译:太湖盆地防洪战略

获取原文

摘要

The rapid economical and social development in Taihu Basin proposes higher requirements on flood control and public security. Current flood control situation in Taihu Basin is briefly analyzed. 1991 and 1999 rainfalls are more serious than 1954 rainfall, which is the current design standard. In addition, incessancy waterproof land use and water surface reclamation increase flood control difficulty. Taihu basin hydrodynamic numerical model is set-up, which consists of runoff module and l-dimensional unsteady river network flow module. Based on present key projects, following the drainage frame of 'northward to Yangtze River, eastward to Huangpu River and southward to Hang Zhou Bay', and considering storage and drainage ability as a whole, Taihu Basin flood control strategy is brought forward. Based on Taihu basin hydrodynamic numerical model, flood control ability of the planning works is evaluated. It shows that the flood control strategy can increase the ability of out-lake flood and reduce flood water level of Taihu Lake and plain region substantially.
机译:太湖盆地的快速经济和社会发展提出了对防洪和公共安全的更高要求。简要分析了太湖盆地的当前防洪局面。 1991年和1999年的降雨比1954年降雨量更严重,这是目前的设计标准。此外,手段防水土地使用和水面填海增加洪水控制难度。建立太湖盆地流体动力学数值模型,由径流模块和L维不稳态河网络流量模块组成。基于当前关键项目,遵循“向北到长江,向后到黄浦江以向南杭州湾”的排水框架,并考虑整个储存和排水能力,太湖盆地防洪战略提出。基于太湖流域流体动力学数值模型,评估了规划工程的防洪能力。它表明,防洪策略可以提高外湖洪水的能力,减少太湖和平原地区的洪水水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号