首页> 外文会议>SOLAR 2011 >BYERS AUTO GROUP: A CASE STUDY INTO THE ECONOMICS, ZONING, AND OVERALL PROCESS OF INSTALLING SMALL WIND TURBINES AT TWO AUTOMOTIVE DEALERSHIPS IN OHIO
【24h】

BYERS AUTO GROUP: A CASE STUDY INTO THE ECONOMICS, ZONING, AND OVERALL PROCESS OF INSTALLING SMALL WIND TURBINES AT TWO AUTOMOTIVE DEALERSHIPS IN OHIO

机译:Byers Auto Group:以俄亥俄州两家汽车经销商安装小型风力涡轮机经济学,分区和整体过程的案例研究

获取原文

摘要

Pathways to installing renewables, including small wind turbines, can sometimes be difficult due to economics, zoning issues, public perception, and other barriers. Persistence and innovation, however, can result in amazing successes, leading to transformations in local communities. In a process that began in 2008, the Byers Auto Group, an Ohio-based automotive dealership, established itself as a renewable energy leader by utilizing energy efficiency, recycled materials, and renewable energy technologies at two of its showrooms. While planning and designing a new Toyota showroom at the Delaware County location, the Group integrated high-efficiency lighting, recycled glass tiles, and other approaches to create a greener and healthier facility. In addition, the dealership installed a Proven Energy 15-kilowatt (kW) turbine. The Group also installed a Northern Power Systems Northwind 100 turbine at its Columbus location. Both turbines became operational in fall 2010. The Group experienced various challenges and learned valuable lessons while siting projects in these locations without zoning regulations specific to wind energy systems and with limited project examples to follow. With more diverse applications becoming increasingly common, examples of projects and the required steps --from idea through installation -- will become more available to pave the way for future project installations. This case study will delve into the specifics of the $600,000 small wind project and describe the process (including financing, zoning, site evaluation, and turbine selection). Estimated annual energy production, as well as an estimate of the percentage of energy needs met by these turbines will also be discussed.
机译:通往安装可再生能源,包括小型风力涡轮机,有时是困难的,因为经济,分区的问题,公众的看法,和其他障碍。持久性和创新,但是,可以产生令人惊叹的成功,导致当地社区的转变。在始于2008年的过程中,拜尔斯汽车集团,一个位于俄亥俄州的汽车经销商,建立了自己作为利用能源效率,再生材料和可再生能源技术在其两个展厅的可再生能源的领导者。虽然规划和设计在特拉华县位置的新丰田展厅,集团整合高效率的照明,回收的玻璃砖,和其他方法来创建一个更加绿色和健康设施。此外,经销商安装了成熟的电能15千瓦(kW)的涡轮机。该集团还安装在其哥伦布位置Northern Power Systems公司的Northwind 100的涡轮。两个涡轮机开始运作,在2010年秋天的集团经历了各种挑战和宝贵的教训,而选址在这些地区的项目不分区规则具体到风能系统,并与有限的项目学习的榜样。随着越来越多的不同的应用越来越普遍,项目和所需步骤的例子,通过安装--from的想法 - 将变得更加可用铺平未来的项目安装的方式。本案例研究将深入到$ 600,000小型风力项目的具体情况,并描述了这个过程(包括融资,分区,现场评价和涡轮选择)。预计年发电量,以及由这些涡轮机满足能源需求的比例的估计也将被讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号