首页> 外文会议>AMSAT-NA annual meeting >The New and Improved ARISS Proposal Process
【24h】

The New and Improved ARISS Proposal Process

机译:新的和改进的Ariss提案过程

获取原文

摘要

In the first half of 2014, NASA's Education Office made the decision to no longer fund its Teaching From Space (TFS) Program. At the time TFS was the primary NASA partner and education liaison for ARISS. One of TFS' roles was to lead the school proposal and selection process in the USA. Except for finding ways to fund existing support personnel, the loss of TFS served as an opportunity for AMSAT and the ARRL to take a hard look at our current education proposal process and improve it. As the new process would be done exclusively by ARRL and AMSAT, it significantly reduced the bureaucratic burden that encumbered the ARISS-USA team when TFS led the effort. This was due to the government requirement to get approval from Congress for all education requests for proposals, including ARISS. As part of the new proposal process, the ARISS-USA team identified several ways we could make requests for ARISS contacts more competitive, with more emphasis on educational content, media outreach and with an improved method for meeting the technical aspects for conducting a contact.
机译:在2014年上半年,美国航空航天局的教育厅做出了教学从太空(TFS)方案的决定,不再基金。当时TFS是为ARISS的主要合作伙伴美国航空航天局和教育联系。一个TFS”的角色是带领美国学校的建议和选择过程。除了设法基金现有支持人员,TFS的亏损充当了AMSAT的机会和ARRL采取我们目前的教育建议过程中认真研究和改进。随着新的进程将被ARRL和AMSAT完全完成,它显著减少了担保的ARISS,美国队的时候TFS带领努力官僚主义负担。这是由于政府要求国会获得批准的建议书的全部教育请求,包括ARISS。随着新提案过程的一部分,ARISS,美国队确定了几个方面,我们都可以成为ARISS联系人请求更有竞争力,更加注重教育内容,媒体宣传以及与满足技术方面用于进行接触的改进方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号