首页> 外文会议>AITES-ITA world tunnel congress >CONSTRUCTION OF A THIRD LANE ALONG THE A1 HIGHWAY ACROSS HILLY FLORENCE OUTSKIRTS: GEOPHYSICAL INVESTIGATION AT TUNNEL ROUTES
【24h】

CONSTRUCTION OF A THIRD LANE ALONG THE A1 HIGHWAY ACROSS HILLY FLORENCE OUTSKIRTS: GEOPHYSICAL INVESTIGATION AT TUNNEL ROUTES

机译:沿着Hilly Florence郊区的A1高速公路施工第三条道路:隧道路线的地球物理调查

获取原文

摘要

The Al highway between Firenze South and Firenze North exits is undergoing a development project, based on the construction of a new third lane and an upgrading of highway interconnections. Moreover at Firenze Certosa exit, a new road with long tunnels is planned to bypass the Galluzzo village. Subsequently an exploration program was settled to investigate the tunnel routes, including boreholes with wireline coring, together with seismic refraction and reflection profiling. The seismic methods, with borehole calibration, were useful to achieve a geometrical reconstruction in a very complex geological environment.
机译:基于建设新的第三道的建设和高速公路互联的升级,射击南部和佛罗伦兹之间的Al高速公路正在进行开发项目。此外,在Firenze Certosa出口,计划绕过Galluzzo村的一条长长隧道的新道路。随后,勘探计划得到解决,以调查隧道路线,包括带有电缆上衣的钻孔,以及地震折射和反射分析。具有钻孔校准的地震方法可用于在非常复杂的地质环境中实现几何重建。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号