首页> 外文会议>International Conference on High Performance Structures and Materials >Innovative procedure to produce high performance pretensioned concrete girders combining high strength concrete and normal or special concrete types
【24h】

Innovative procedure to produce high performance pretensioned concrete girders combining high strength concrete and normal or special concrete types

机译:创新程序生产高性能预张紧混凝土梁组合高强度混凝土和正常或特殊混凝土类型

获取原文

摘要

As is well known, prefabrication procedures allow significant reductions in construction time. In many countries, precast concrete bridges are customary and made up of pretensioned prestressed girders. Both the compressive and tensile strength of the concrete mix must be enough at transfer (which takes place typically two or three days after concrete casting) in order to avoid excessive prestress losses, and undesirable cracking. Many attempts have been made to increase the spectrum of the usual high performance concretes to other concrete types (i.e. normal strength concrete, lightweight concrete and recycled aggregate concrete). Why are these special concrete types not used in the current production of large pretensioned concrete girders? Technical problems have been observed at the critical zones: development length, geometrical discontinuities, supports, etc. A new technique has been developed by the authors to produce hybrid pretensioned concrete elements, combining the usual high strength concretes in the critical zones with other concrete types in the rest of the elements.
机译:众所周知,预制程序允许在施工时间内减少。在许多国家,预制混凝土桥梁是习惯性的,由预应力的预应力梁组成。混凝土混合物的压缩和拉伸强度都必须足够的转移(通常发生在混凝土铸件后两三天),以避免过度预先预损失,并且不希望的裂缝。已经提高了许多尝试,以将通常的高性能混凝土的频谱增加到其他混凝土类型(即正常强度混凝土,轻质混凝土和再生骨料混凝土)。为什么这些特殊的混凝土类型不用于当前生产大型预张加混凝土梁?在临界区观察到技术问题:发展长度,几何不连续性,支持等。作者开发了一种新的技术,以生产混合预张紧混凝土元件,将临界区中的通常的高强度混凝土与其他混凝土类型相结合在其余的元素中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号