首页> 外文会议>SPE Annual Technical Conference and Exhibition >Accessing New Pay Intervals in the Tubing-Casing Annulus Above Top Packer with Cement Packer Technology,S Field,Peninsular Malaysia
【24h】

Accessing New Pay Intervals in the Tubing-Casing Annulus Above Top Packer with Cement Packer Technology,S Field,Peninsular Malaysia

机译:在顶部包装机上的管壳环上的新工资间隔用水泥包装机技术,S场,半岛马来西亚

获取原文

摘要

As a low-cost alternative to expensive rig workovers,placement of a cement packer between tubing and casing has been previously applied in Malaysia.The purpose is to create a new annular barrier above the existing production packer to gain access to behind-casing opportunities(BCOs)or pay zones,removing the need for a workover.These pay zones,usually with minor or unknown production potential,have been left by the operator during initial completion because there were larger pay zones in deeper reservoirs.Cement packer placement can be achieved using basic intervention equipment as opposed to more expensive workover units.The cement packer technique eliminates the need of recompleting the well with a conventional workover rig and reduces operational complications together with cost.There are different methods to deploy a cement packer.The highest chance of success,particularly when larger volumes of cement are needed,is using coiled tubing(CT)as the primary method to place the cement slurry in the tubing/casing annulus.In this method,a cement retainer was used and conveyed with CT.CT provides the ability to sting into the retainer and cement being displaced through the coil,ensuring all completion accessories have no contact with cement slurry which can impair their functionality,and also prevents U-tube effect of the slurry once cement is placed behind the tubing.After the cement is set,a cement bond log(CBL)is run to confirm cement integrity behind the completion tubing before adding new perforations.This paper presents the successful cement packer placement operation with the help of the CT executed on an offshore platform in Peninsular Malaysia.A potential pay zone of the I-Group reservoir was discovered in the field after running pulsed-neutron cased-hole saturation logging tools,which are situated above the production packer; appraisal was required because of the unknown fluid type.Close collaboration among various parties in candidate selection,job preparation and design,cement laboratory testing,and operational planning and execution,were keys to the success of this pilot operation.By proving operational feasibility and economics,the technique opened up additional opportunities in restoring idle wells with bypassed reserves within the same field.
机译:作为昂贵的钻机换流的低成本替代方案,在马来西亚之前应用了管道和外壳之间的水泥包装机的放置。目的是在现有的生产封隔器上方创造一个新的环形屏障,以获得套管后面的机会( BCOS)或付费地区,删除了对工作组的需求。这些付费区域通常在初始完成期间由操作员留下了次要或未成年的生产潜力,因为在更深层次的水库中有更大的工资区。可以实现较大的封装包装使用基本干预设备而不是更昂贵的工作台。水泥包装机技术消除了与传统的工作台钻机重新完成的需要,并与成本降低了操作并发症。部署水泥包装机的方法是不同的。成功,特别是当需要更大的水泥时,使用卷绕管(CT)作为放置水泥SL的主要方法管道/外壳中的尿液中的尿液。在该方法中,使用水泥保持器并用CT.ct传送,提供了通过线圈移入固定器和水泥的能力,确保所有完整的附件没有与水泥浆料的接触。可以损害它们的功能,并且还可以防止浆料的U形管效果一旦将水泥放在管道后面。在嵌入水泥后,将水泥键对数(CBL)运行,以确认在完成新的穿孔之前确认完成管道后面的水泥完整性这篇论文介绍了在半岛马来西亚在海上平台上执行的CT在近海平台上的CT成功的水泥包装机放置操作。在运行脉冲 - 中子套孔饱和度测井后,在该领域发现了I-Group储层的潜在工资区工具,位于生产封隔器上方;由于未知的流体类型,需要评估。候选人选择中的各方之间的合作,工作制定和设计,水泥实验室检测和运营规划和执行,是该试点运营的成功的关键。通过证明操作可行性和经济性,该技术开辟了额外的机会,在同一领域内用旁路储备恢复空闲井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号