首页> 外文会议>International Conference on E-Product E-Service and E-Entertainment >Application of Gray Fuzzy Theory for Transformer Substation Construction Project Post-Evaluation
【24h】

Application of Gray Fuzzy Theory for Transformer Substation Construction Project Post-Evaluation

机译:灰色模糊理论在变电站建设项目后评价后的应用

获取原文

摘要

Taking the fuzzy and grey features of transformer substation construction project into account, this paper classified the evaluation system of transformer substation construction project into 4 indexes of grade A and 13 indexes of grade B. The weight of each index is decided reasonably by the Analytic Hierarchy Process (AHP).The grey number and the grey evaluating weight of each index are obtained by the grey theory, the grey fuzzy weight matrix is formed, and the grey fuzzy comprehensive evaluating matrix is obtained. Then the grade of the evaluated subject can be calculated, to get the evaluation outcome.
机译:采用变电站建设项目的模糊和灰色特征考虑,本文将变电站建设项目评价系统分为4级级A和13级指标的索引。每个指数的重量由分析层次结构决定过程(AHP)。通过灰色理论获得每个索引的灰度和灰度评估重量,形成灰色模糊重量矩阵,获得灰色模糊综合评估矩阵。然后可以计算评估对象的等级,以获得评估结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号