首页> 外文会议>International Conference of Industrial, Mechanical, Electrical and Chemical Engineering >Investigating total cost and service level of parts with different booking type using continuous review method
【24h】

Investigating total cost and service level of parts with different booking type using continuous review method

机译:使用连续审查方法调查具有不同预订类型的零件的总成本和服务水平

获取原文

摘要

A hospital equipment company that has large market must maintain their competitiveness both in terms of the quality, price, number of employees, timeliness of delivery, the expansion of marketing, technology development, et all. Problems that faced by hospital equipment companies in Indonesia are often running out of stock of one of the actuator motor parts of the electric bed product. Motor actuator is imported from abroad supplier. These parts should be imported so the availability of goods can be maintained. On the other hand, the import process that takes a long lead time and high costs become a serious problem for the company. In this case study, the supplier offers two types of booking, there are the booking type 1 which is a standard order cost with a long lead time and the booking type 2 which has higher order cost and faster lead time. Here, we investigate the total cost and the service level resulting from both booking types by utilizing a continuous review method. Finally, the result of the research shows that the booking type 1 gives a lower total cost and a higher service level. Therefore, the type 1 is selected for managing the part of motor actuator.
机译:一家拥有大型市场的医院设备公司必须在质量,价格,员工人数,交货及时的及时性,扩大营销,技术开发等方面保持竞争力。印度尼西亚的医院设备公司面临的问题通常缺货缺货了电动床产品的一个执行器电机部件。电机执行器从国外进口供应商。这些部件应进口,以便维护货物的可用性。另一方面,需要长时间发出时间和高成本的导入过程成为公司的严重问题。在这种情况下,供应商提供两种预订,预订类型1是一个标准订单成本,具有长的时间和预订类型,具有更高的订单成本和更快的交货时间。在这里,我们通过利用连续审查方法调查两种预订类型所产生的总成本和服务水平。最后,研究结果表明,预订1型总成本和更高的服务水平。因此,选择类型1用于管理电动机执行器的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号