首页> 外文会议>SPE Russian Petroleum Technology Conference and Exhibition >A Comprehensive Approach to Achieve Record Performance on Uvat Project
【24h】

A Comprehensive Approach to Achieve Record Performance on Uvat Project

机译:综合途径,实现UVAT项目的记录性能

获取原文

摘要

This paper presents the successful implementation of a new drilling optimization process applied during the West Siberia Uvat project. The optimization process produced outstanding results in daily drilling rate, mean rate of penetration (ROP), and overall drilling rate. This paper describes the planning and drilling process used during operations and the record-breaking results. Solutions and technologies were successfully replicated during the project. Drilling optimization combined with new technologies, such as the combined measurement-while-drilling (MWD) system and new generation of downhole drilling motors, significantly reduced drilling time. This paper discusses the collaborative effort that helped provide better understanding of the project's capabilities. It also describes the optimization of advanced technologies, which helped identify and eliminate risks. The practices described in this paper provide significant value to local operators and service companies that perform operations at high drilling rates.
机译:本文提出了在西西伯利亚UVAT项目中应用了新的钻井优化过程的成功实施。优化过程在日常钻井率,平均渗透率(ROP)和整体钻井率方面产生了出色的结果。本文介绍了在运营期间使用的规划和钻井过程和记录破坏结果。在项目期间成功复制了解决方案和技术。钻探优化结合新技术,如组合测量 - 钻孔(MWD)系统和新一代井下钻孔电机,显着降低了钻井时间。本文讨论了帮助更好地了解项目能力的合作努力。它还描述了高级技术的优化,这有助于识别和消除风险。本文描述的实践为本地运营商和服务公司提供了重大价值,该公司以高钻井率执行运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号