首页> 外文会议>POWER-GEN Asia Renewable Energy World Asia >Mandatory Partner Sponsor of PLN Subsidiary Company for IPP Development in Indonesia to Strengthen Project Structure and Reduce Risk for Foreign Investor: Case study 2x1000 MW Jawa 7 Coal Steam Fired Power Plant in Banten, Indonesia(PPT)
【24h】

Mandatory Partner Sponsor of PLN Subsidiary Company for IPP Development in Indonesia to Strengthen Project Structure and Reduce Risk for Foreign Investor: Case study 2x1000 MW Jawa 7 Coal Steam Fired Power Plant in Banten, Indonesia(PPT)

机译:PLN子公司的强制合作伙伴赞助印度尼西亚的IPP开发,加强项目结构,减少外国投资者风险:案例研究2x1000 MW Jawa 7烟腾,印度尼西亚Banten(PPT)

获取原文

摘要

1. The financing of Jawa 7 project had been successfully mobilized for the Project within the acceleration scheduled timeframe. 2. Based on other projects before, the total days of the IPP project development timeline were about 24-30 months (from PQ to Financing Date) 3. Using scheme mandatory partner sponsor of PLN subsidiary, initiating the project earlier through conducting feasibility study, preparing land acquisition, conducting Environmental Impact Assessment, getting permit and licenses, and conducting financing plan, the total days of the project development timeline became about 18 months. 4. Using the scheme PJB as mandatory partner sponsor of PLN subsidiary will increase project viability because some risks related license and permit were mitigated earlier and the land already provided by the PLN subsidiary. 5. To make the project bankable and to guarantee fair and sustained returns to investors, as expected by market, PJB will hold its shares in the Project Company until the end of the PPA term to mitigate risk associated with the absence of a government guarantee for PLN’s payment obligations.
机译:1. Jawa 7项目的融资已成功调动了加速计划时间范围内的项目。 2.根据以前的其他项目,IPP项目开发时间表的总日期大约24-30个月(从PQ到融资日期)3。利用PLN子公司的计划强制伙伴提案国,通过进行可行性研究提前启动项目,准备土地征集,进行环境影响评估,获取许可证和许可证,并进行融资计划,项目开发时间表的总日期大约18个月。 4.使用该计划PJB作为PLN子公司的强制伙伴赞助商将增加项目可行性,因为有些风险相关许可证和许可证于早些时候和已由PLN子公司提供的土地。 5.按照市场预期的预期,投资和担保公平和持续回报的项目,PJB将在项目公司持有其股份,直至PPA学期结束,以减轻与缺乏政府保障的风险PLN的付款义务。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号