Evaluation of Production Capacity of Geothermal Power Plants in Turkey

机译:土耳其地热发电厂生产能力评价

获取原文

摘要

The average working capacity (the ratio of produced power to gross installed power plant capacity) of active geothermal power plants in Turkey as of the end of 2019 is 64.5 %. The main reasons of the low utilization are the proximity of the licensed areas and high interference between geothermal wells. Lack of unitized reservoir management and aggressive geothermal production without exchanging resource information among the producers are other triggering reasons behind the low usage capacity. In this study, the production capacity of the major geothermal fields in Turkey is evaluated. The characteristics of the major fields located in Bueyuek Menderes and Gediz Grabens and their corresponding production history are analyzed for a better understanding of low production capacity of geothermal power plants in Turkey. It is found that as the number of production wells increased, the production capacity of the plants decreased continuously. It has been observed that drilling make up wells and using downhole pumps are commonly applied to increase the working capacity instead of having a unitized reservoir management.
机译:截至2019年底,土耳其有源地热发电厂的平均工作能力(生产权力为生产权力厂能力)为64.5%。低利用率的主要原因是持牌区域的附近以及地热井之间的干扰。未经生产者之间缺乏联合水库管理和侵略性地热生产,在不交换生产商之间的资源信息是欠下使用率低的其他触发原因。在这项研究中,评估了土耳其主要地热场的生产能力。分析了位于Bueyuek Menderes和Gediz Grabens的主要田地的特点及其相应的生产历史,以更好地了解土耳其地热发电厂的低产量。结果发现,随着生产井的数量增加,植物的生产能力连续下降。已经观察到,钻井补充井并使用井下泵,通常应用于增加工作能力,而不是拥有一个单元化的储层管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号