首页> 外文会议>International Association for Bridge and Structural Engineering Symposium >Analysis of Shear Lag Effect in Box Girder of Cable-Stayed Bridge with Mono-Tower and Momo-Cable Plane
【24h】

Analysis of Shear Lag Effect in Box Girder of Cable-Stayed Bridge with Mono-Tower and Momo-Cable Plane

机译:单塔和MOMO-CABLE平面斜拉桥箱梁箱梁剪力滞后分析

获取原文

摘要

Based on one typical cable-stayed bridge with mono-tower and mono-cable plane, the shear lag effect in such kind of bridge with multi-cell box girder is analysed by spatial finite element method. The influence of some factors such as the type and the transverse acting location of external load on the shear lag effect are explored. Some useful conclusions are drawn through this study.
机译:基于一个典型的电缆停留桥与单塔和单线电缆平面,通过空间有限元法分析了具有多电池箱梁这种桥梁中这种桥梁的剪切滞后效果。 探讨了诸如类型和横向作用位置的一些因素对剪切滞后效果的影响。 通过这项研究提出了一些有用的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号