首页> 外文会议>Asia steel international conference >Stable and High Productivity Operations of 3800m3 Blast Furnace in WISCO
【24h】

Stable and High Productivity Operations of 3800m3 Blast Furnace in WISCO

机译:威斯康星州3800m3高炉的稳定和高生产率运营

获取原文

摘要

This paper summarizes the operational practices of 3800m3 blast furnace in WISCO after its blowing in in 2009.Stable operations and high productivity have achieved through reasonable controlling raw materials,furnace profiles and optimizing routinely management etc.This largest BF of wisco has conducted a smooth performance after its commercial practices and resulted in a remarkable profit.
机译:本文总结了2009年吹入后3800m3高炉的运营实践。通过合理控制原材料,炉子型材,经常管理优化,通过合理的控制来实现了3800m3高炉的运营实践。这一最大的威尔科的BF进行了平稳的性能经过商业实践,导致了卓越的利润。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号