首页> 外文会议>Collection systems conference >Keeping History Alive: A Phased Plan for Revitalizing an Aged Combined Sewer Interceptor in Conjunction with the Ongoing Redevelopment of the Richmond, Virginia Riverfront
【24h】

Keeping History Alive: A Phased Plan for Revitalizing an Aged Combined Sewer Interceptor in Conjunction with the Ongoing Redevelopment of the Richmond, Virginia Riverfront

机译:保持历史活动:将竞争历史振兴的阶段合并的下水道拦截器的分阶段与Richmond,Virginia Riverfront的持续重建一起振兴

获取原文

摘要

Through a holistic planning approach, the City of Richmond, Virginia is incorporating capital improvement projects into their revitalization effort of redeveloping the historic downtown riverfront. This presentation will discuss the replacement and realignment of an aged and deteriorating combined sewer interceptor, which is divided into three phases: 1. Phase 1: Chimborazo Drop Shaft & Interceptor Sewer Replacement 2. Phase 2: Libby Terrace & Chimborazo Interceptor Sewer Realignment 3. Phase 3: Fulton Gas Works - Chimborazo Interceptor Sewer Realignment.
机译:通过整体规划方法,弗吉尼亚州里士满市正在将资本改进项目纳入他们的振兴努力,重新开发历史悠久的河滨河边。本演示文稿将讨论老年人和恶化的下水道拦截器的替代和调整,分为三个阶段:1。第1阶段:Chimborazo下降轴和拦截下水道更换2.第2阶段:Libby Terrace&Chimborazo拦截器下水道调整3。第3阶段:富尔顿天然气作品 - Chimborazo拦截器下水道调整。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号