首页> 外文会议>International Conference on Advances in Construction Machinery and Vehicle Engineering >An Integrated Method for the Un-Paced Buffered Mixed-Model Assembly Line Balancing and Sequencing
【24h】

An Integrated Method for the Un-Paced Buffered Mixed-Model Assembly Line Balancing and Sequencing

机译:不节奏缓冲混合模型装配线平衡和测序的集成方法

获取原文

摘要

Assembly line balancing and sequencing are two main problems in the planning of a mixed-model assembly line. In recent years, the un-paced buffered mixed-model assembly line with buffers between workstations has been widely used in industry. In order to solve the balancing and sequencing problem and ensure the efficient operation of the assembly line, an integrated method for the balancing and sequencing of unpaced buffered mixed-model assembly line is proposed. A combined precedence diagram is used to transform the mixedmodel assembly line balancing problem into a single model balancing problem. The objective of the balancing problem is to minimize cycle time under given the number of the workstations. A combined priority rule is adopted to find a solution. Based on the result of the balancing problem, the NEH (Nawaz-Enscore-Ham) algorithm is implemented for the sequencing problem to minimize the makespan considering the blocking owing to the buffers. The effectiveness of the method is verified by three cases.
机译:装配线平衡和测序是混合模型装配线规划中的两个主要问题。近年来,在工业中,具有工作站之间的缓冲器的Un-Puded缓冲混合模型装配线已被广泛应用于工业中。为了解决平衡和测序问题并确保装配线的有效操作,提出了一种用于平衡和未平台缓冲混合模型装配线的平衡和排序的集成方法。组合优先级图用于将混合模型组合线平衡问题转换为单个模型平衡问题。平衡问题的目的是最小化给定工作站的数量下的循环时间。采用组合优先级规则来查找解决方案。基于平衡问题的结果,为测序问题实现了NEH(Nawaz-enscore-HAM)算法,以最小化考虑到缓冲区阻塞的MakEspan。三种情况验证了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号