首页> 外文会议>Nanotechnology 2009 : Technical proceedings >Cost Saving Strategies: Using a Project Planning Process That Can Integrate Capital and Operational Spending Into a Nanofabrication Business Plan
【24h】

Cost Saving Strategies: Using a Project Planning Process That Can Integrate Capital and Operational Spending Into a Nanofabrication Business Plan

机译:节省成本的策略:使用可以将资金和运营支出整合到纳米制造业务计划中的项目计划流程

获取原文
获取原文并翻译 | 示例

摘要

AGI will show how a project planning process that includes a business case analysis for Nanofabrication buildings can help with many of the design, construction and operational decisions for the buildings. The typical building project often focuses only on capital costs and timing. Items such as the costs of the equipment, cost of the building, and a general timeline are often considered. However, how the building design can affect the equipment start up process and ongoing operating costs are often overlooked. Items such as facilities cost, equipment maintenance, consumables, product yield, and personnel need to be considered to realistically evaluate the alternatives. Based on the desired outputs of the model and the amount of data available there are three levels at which the model could be developed. AGI will illustrate several examples using our proprietary software programs CARME, Pluto, and Jupiter which have been successfully used to calculate varying levels of detail for operational costs. By using these models, tradeoffs can be evaluated to optimize the long and short term costs of running a facilities and building product.rnAttendees will learn how to use the three models to analyze the income and expenses for a Nanofabrication Operation, how to use these analyses to make decisions on design, construction and operational strategies, and how to forecast product costs under a variety of circumstances.
机译:AGI将展示包括纳米制造建筑物的业务案例分析在内的项目规划流程如何帮助建筑物的许多设计,建造和运营决策。典型的建筑项目通常只关注资本成本和时间安排。通常会考虑设备成本,建筑物成本和总体时间表等项目。但是,建筑设计如何影响设备的启动过程和持续的运营成本通常被忽略。需要考虑设施成本,设备维护,消耗品,产品良率和人员等项目,以切实评估替代方案。根据模型的期望输出和可用数据量,可以在三个级别上开发模型。 AGI将使用我们的专有软件程序CARME,Pluto和Jupiter演示几个示例,这些示例已成功用于计算运营成本的各种细节级别。通过使用这些模型,可以评估权衡以优化设施和建筑产品运营的长期和短期成本。与会者将学习如何使用这三种模型来分析纳米制造业务的收入和支出,以及如何使用这些分析在各种情况下就设计,施工和运营策略以及如何预测产品成本做出决策。

著录项

  • 来源
  • 会议地点 Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston TX(US);Houston
  • 作者

    A. Gregg; M. Strnad;

  • 作者单位

    Abbie Gregg, Inc. 1130 East University Drive, Suite 105, Tempe, Arizona 85281, USA;

    Abbie Gregg, Inc. 1130 East University Drive, Suite 105, Tempe, Arizona 85281, USA;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 特种结构材料;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号