Dams and People; s Participation

机译:水坝和人民;参与

获取原文
获取原文并翻译 | 示例

摘要

According to the CMD. THDC, though studies as per clearance letter could not be completed/Action Plans formulated within the dates stipulated by MoEF, the required studies were completed and their reports submitted to Government before project was accorded investment approval in March, 1994. CMD also stated that having submitted the study reports of MoEF their acceptance had to be assumed in the absence of a communication to the contrary. However, the committee noted that work on the project was ongoing even before the investment clearance was received, in 1994 and further, the dates for submission of environmental reports and plans, as per the conditions of clearance, were not linked to the date of investment clearance. In any case, it was essential that a comprehensive study of fauna, flora and other aspects of the environment, and the initiation of the required action plans for their conservation, should have been completed before any engineering works were initiated, so as to prevent disturbance and destruction. The committee felt that clearance cannot be assumed as it is presumably stipulated to ensure the appropriateness and adequacy of the studies. Conseqnelty, the committee came to the conclusion that the conditions of clearance, as laid down by the MoEF in its letter No.2-19/81-HCT/l A-l dated 19 July 1990 read with DO letter No.2-19/81-1 A-l dated 11 October 1993. had not been complied with. The status of compliance is summarised in table III. 1.2 below and is discussed in the relevant chapters." It will seen from the table that while there have been delays in the submission of studies and action plans, the position is that even several years after such submission there has been neither any final approval by MoEF nor a final rejection followed by consequential action in terms of the conditions of clearance." Even the studies that had been carried out were judged by the committee to be inappropriate or inadequate. In other words, even after eight years since conditional clearance was obtained, the required studies and action plans had not been completed.
机译:根据CMD。 THDC虽然无法按照批准书完成研究/未在MoEF规定的日期内制定行动计划,但所需的研究已完成,其报告在1994年3月获得投资批准之前已提交给政府。CMD还指出,提交MoEF的研究报告时,必须在没有相反消息的情况下假设其接受。但是,委员会注意到,即使在1994年收到投资批准书之前,该项目的工作仍在进行中。此外,根据批准条件,提交环境报告和计划的日期与投资日期没有关系。清除。无论如何,在开始任何工程工作之前,必须完成对动物,植物和环境其他方面的全面研究,以及完成必要的环境保护行动计划,以防止干扰。和破坏。委员会认为不能假定已通过批准,因为这是为了确保研究的适当性和充分性而规定的。结果,委员会得出结论,即教育部在1990年7月19日第2-19 / 81-HCT / l A1号信中规定的通行条件,附有DO第2-19 / 81号信尚未遵守1993年10月11日的-1 A1。表三概述了遵守情况。从下面的1.2中进行讨论,并在相关的章节中进行了讨论。”从表中可以看出,尽管研究和行动计划的提交存在延迟,但情况是,即使在提交此类报告的几年之后,也没有任何最终批准。 MoEF也不是最终批准,然后根据批准条件采取相应行动。”委员会甚至认为已经进行的研究都不适当或不充分。换句话说,即使自获得条件许可以来已有八年,所需的研究和行动计划仍未完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号