首页> 外文会议>NASCODE V >The strategy for the maintenance scheduling of the generating units
【24h】

The strategy for the maintenance scheduling of the generating units

机译:发电机组维护计划的策略

获取原文
获取原文并翻译 | 示例

摘要

The maintenance schedules of generating units attracts great attention in power system planning and designing, and also operation management. The power system maintenance schedule is a constrained optimization problem. In this paper, objective functions in power system maintenance are obtained and certain constraints are set up. The most used heuristic methods for maintenance schedule optimization are the levelized reserve method and the levelized risk method. They are discussed and used for the maintenance schedule optimization in an interconnected power system. The strategy in the maintenance scheduling of the generation units is also given.
机译:发电机组的维护计划在电力系统规划和设计以及运营管理中引起了极大的关注。电力系统维护计划是一个受约束的优化问题。本文获得了电力系统维护的目标函数,并建立了一定的约束条件。用于维护计划优化的最常用的启发式方法是均摊储备金法和均摊风险法。讨论了它们,并将其用于互连电源系统中的维护计划优化。还给出了发电机组维护计划中的策略。

著录项

  • 来源
    《NASCODE V》|1987年|p.172-176|共5页
  • 会议地点 Dublin(IE);Dublin(IE)
  • 作者

    Basaran U.; Kurban M.;

  • 作者单位

    Anadolu University, Turkey;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 结构、器件;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号