首页> 外文会议>Organizational transformation: opportunities and challenges >SCHEDULING POLICIES IN AN ASSEMBLY ENVIRONMENT WITHEARLINESS AND TARDINESS
【24h】

SCHEDULING POLICIES IN AN ASSEMBLY ENVIRONMENT WITHEARLINESS AND TARDINESS

机译:提前且有针对性地对装配环境中的策略进行调度

获取原文
获取原文并翻译 | 示例

摘要

Dynamic assembly flow shop problems are among thernmost difficult scheduling problems in whichrnprecedence relations among operations of the same jobrnas well as precedence relations among different jobsrnmust be considered. Optimal solutions are difficult tornobtain; therefore, dispatching rules have been used tornsolve this problem. Most research however,rnconsidered regular measures of performance. In thisrnwork, earliness and tardiness, a non-regular measure,rnwill be used to model a Just in Time (JIT)rnenvironment. A discrete-event simulation model isrndeveloped to evaluate two popular dispatching rules.
机译:动态装配流水车间问题是最困难的调度问题之一,在该问题中,必须考虑相同工作流程之间的优先关系以及不同工作流程之间的优先关系。最佳解决方案难以确定。因此,调度规则已用于解决此问题。然而,大多数研究都考虑定期评估绩效。在这项工作中,将使用一种不定期的度量方法-提前性和拖延性来对准时制(JIT)环境进行建模。建立了离散事件仿真模型来评估两种流行的调度规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号