首页> 外文会议>Parallel and Distributed Computing and Networks >SCHEDULING AND EVALUATION OF SEQUENTIAL AND PARALLEL PROCESSES' INTERACTION IN A NONDEDICATED CLUSTER
【24h】

SCHEDULING AND EVALUATION OF SEQUENTIAL AND PARALLEL PROCESSES' INTERACTION IN A NONDEDICATED CLUSTER

机译:预定集群中顺序和并行过程交互的调度和评估

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a performance evaluation of the interactions between local sequential processes running on behalf of interactive applications and parallel processes running as part of an overall parallel application on a nonded-icated cluster environment. To control the interactions between the two types of processes we propose to constrain the scheduling of local interactive processes by a measure of the maximum response time expected by the workstation (WS) user. The measure is assumed obtained through empirical studies. We propose a scheduling scheme that within the max-response time cycle computes time quanta to satisfy both local interactive processes present in the system and the parallel task process. Simulation results have shown the effectiveness of the proposed method in allowing the parallel tasks to ensure a minimum speedup even in heavy loaded situations and to maximize the speedup adaptively depending on the load conditions. In addition, the simulation results revealed the sensitivity of the interactions to factors such as interactive job demands, parallel job demand, and arrival rate of interactive jobs among others.
机译:本文介绍了对代表交互式应用程序运行的本地顺序进程与作为非并行集群环境中的整体并行应用程序的一部分运行的并行进程之间的交互性能的性能评估。为了控制两种类型的过程之间的交互,我们建议通过测量工作站(WS)用户期望的最大响应时间来限制本地交互过程的调度。假设该措施是通过经验研究获得的。我们提出了一种调度方案,该方案在最大响应时间周期内计算时间量,以满足系统中存在的本地交互过程和并行任务过程。仿真结果表明,该方法在允许并行任务以确保即使在重载情况下也能确保最小加速并根据负载条件自适应地最大化加速的有效性。此外,仿真结果还显示了交互对交互工作需求,并行工作需求和交互工作到达率等因素的敏感性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号