Construction Observation and Inspection of a 90-inch (228cm) Wastewater Transfer Line

机译:90英寸(228厘米)废水输送线的施工观察和检查

获取原文
获取原文并翻译 | 示例

摘要

The Interconnect Pipeline Project is one of three projects that make up the San Antonio Water System (SAWS) Interconnect Program. CH2M HILL was the designer for the Interconnect Pipeline Project and also provided construction inspection services. This project and two others were combined into a single active construction program for which CH2M HILL was selected to provide construction management services. The Interconnect project includes construction of a 16,300 foot (4,968m) 90-inch (228cm) raw wastewater transfer pipeline, a 13,500 foot (4,115m) 36-inch (91cm) recycled water line and 20,000 feet (6,096m) of fiber optic cable. The second project, the Interconnect Modifications Part B, includes raw wastewater connections at the Salado Creek WRC and the Dos Rios WRC. The third, the Dos Rios Recycled Water Pump Station Project, consists of a recycled water pump station at the Dos Rios WRC, and a recycled water pipeline terminal connection at the Salado Creek WRC. The primary purpose of this project is to link the Salado Creek WRC and the Dos Rios WRC together to optimize future operations. The project will allow the transport of raw wastewater to the Dos Rios WRC from the Salado Creek sewershed. At present, the Dos Rios WRC has excess treatment capacity. The link will allow SAWS to decommission the Salado Creek WRC, thereby saving approximately $5 million per year in operating costs.
机译:互连管道项目是组成圣安东尼奥水系统(SAWS)互连计划的三个项目之一。 CH2M HILL是互连管道项目的设计师,还提供了施工检查服务。该项目和另外两个项目被合并为一个单独的在建工程计划,为此CH2M HILL被选择提供建筑管理服务。互连项目包括建设一条16,300英尺(4,968m)90英寸(228厘米)的原废水传输管道,一条13,500英尺(4,115m)36英寸(91厘米)的再生水管线和20,000英尺(6,096m)的光纤。电缆。第二个项目是“互连修改B部分”,其中包括Salado Creek WRC和Dos Rios WRC的原废水连接。第三个项目是Dos Rios再生水泵站项目,包括Dos Rios WRC的再生水泵站和Salado Creek WRC的再生水管道终端连接。该项目的主要目的是将Salado Creek WRC和Dos Rios WRC连接在一起,以优化未来的运营。该项目将允许将原废水从萨拉多河下水道运至Dos Rios WRC。目前,Dos Rios WRC的处理能力过大。该链接将使SAWS能够停用Salado Creek WRC,从而每年节省约500万美元的运营成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号