首页> 外文会议>Pipeline Division Specialty Conference; 20050821-24; Houston,TX(US) >Structural Rehabilitation of Cast-In-Place Concrete Sewers
【24h】

Structural Rehabilitation of Cast-In-Place Concrete Sewers

机译:现浇混凝土下水道的结构修复

获取原文
获取原文并翻译 | 示例

摘要

This paper discusses the design and installation of a Grouted-In-Place PVC liner (GIPL) in a large diameter cast-in-place concrete pipe (CIPCP). The Sims Bayou trunk sewer in southeast Houston, Texas consists of several miles of 72" (1.83 m) and 78" (1.98 m) nominally circular concrete structures built about 40-years ago. This paper deals with the structural rehabilitation of approximately 1500 feet (457 m) of 72" (1.83 m) and 8500 feet (2,591 m) of 78" (1.98 m) of this sewer that has deteriorated due to hydrogen sulfide induced corrosion of the inner surfaces of the pipe walls. The design of the GIPL follows classical engineering mechanics for composite reinforced concrete structures. Design examples are given for various levels of deterioration of the host structure.
机译:本文讨论了大直径现浇混凝土管(CIPCP)中现浇PVC衬里(GIPL)的设计和安装。德克萨斯州休斯顿东南部的Sims Bayou干线下水道由数英里的72英寸(1.83 m)和78英寸(1.98 m)名义上为圆形的混凝土结构构成,大约建于40年前。本文讨论了该污水管的大约1500英尺(457 m)(72英寸(1.83 m))和8500英尺(2,591 m)(78英寸(1.98 m))的结构修复,该管道由于硫化氢引起的腐蚀而恶化。管壁的内表面。 GIPL的设计遵循复合钢筋混凝土结构的经典工程力学。给出了针对主机结构各种级别恶化的设计示例。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号