首页> 外文会议>Port development in the changing world (PORTS 2004) >Load Test of Timber Piers at Naval Weapons Station, Concord, California
【24h】

Load Test of Timber Piers at Naval Weapons Station, Concord, California

机译:加利福尼亚康科德海军武器站的木墩载荷测试

获取原文
获取原文并翻译 | 示例

摘要

Severe load restrictions on ammunition trains resulting from load rating were delaying the design of repairs to the timber wharves at Piers 3 and 4 at Naval Weapons Station (NWS), Concord, California. To keep the project moving, the designer proposed a full-scale pile load test to the Navy. Once the proposal was accepted, a test program was developed utilizing a large-capacity derrick barge and water filled tank that was completed within a month. The test proved the full design capacity of the piles.
机译:由于额定载荷导致弹药列车受到严格的载荷限制,这推迟了加利福尼亚康科德市海军武器站(NWS)3号和4号码头木材码头的维修设计。为了保持项目的进展,设计师向海军提出了全面的桩载荷测试。提案被接受后,将使用一个大容量的井架驳船和一个装满水的储罐开发一个测试程序,该程序将在一个月内完成。测试证明了桩的全部设计能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号