As a major element in the Danish energy policy, approx. 300 MW large-scalernoffshore wind power facilities will be erected by the end of 2003. The Elsam 160rnMW Horns Rev Offshore Project in the North Sea is the first of these facilities torncome past the drawing board and be given the final erection permit. The project is arnmulti-contract project, which comprises a wind farm with 80 turbines and anrninterconnection to the grid (offshore substation and a cable leading to the shore andrnthe main high-voltage grid). The project has now passed the commissioning phasernand the first operation experience has been gained. Data have been collected for anrnevaluation of the project feasibility and for EIA purposes, and according to thernrecorded data the mean wind speed is assessed to be 9.7 m/s. By now the authoritiesrnand the owners (Elsam and Eltra) have reached a common ground for the question ofrnsettlement and proper legislation has been adopted. Project construction costs totalrnabout DKK 2.0 billion (Euro 270 million).
机译:作为丹麦能源政策的主要内容,约到2003年底,将建立300兆瓦的大型海上风电设施。北海的Elsam 160rnMW霍恩斯海上风电项目是第一个通过图纸而被推翻并获得最终安装许可的设施。该项目是arnmulti-contract项目,包括一个具有80台涡轮机的风电场,并与电网(离岸变电站和通向海岸以及主要高压电网的电缆)互连。该项目现已通过调试阶段,并获得了第一份运营经验。收集到的数据用于评估项目的可行性和进行EIA,根据记录的数据,平均风速估计为9.7 m / s。到目前为止,当局和业主(Elsam和Eltra)已就解决问题达成共识,并通过了适当的立法。项目建设成本总计约20亿丹麦克朗(2.7亿欧元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号