首页> 外文会议>The proceedings of the 2nd international conference on value engineering and value management (2009) >Application of Value Engineering in Optimizating Mine Production System Capacity
【24h】

Application of Value Engineering in Optimizating Mine Production System Capacity

机译:价值工程在矿山生产系统产能优化中的应用

获取原文
获取原文并翻译 | 示例

摘要

In the process of checking production capacity, coal mine has surplus production capacity in some parts of production systems or processes, and it causing unnecessary resource wastes; therefore it is essential to optimize production capacity of coal mine production system which having much more resources wastes. In order to solve the problem, the paper propose that it used value engineering method to estimate the cost, function and value of optimize scheme of coal mine production system capacity, established model of choosing experts and optimizing model of coal mine production system capacity, then took and analyzed an example. The result shows that value engineering method is suitable for optimizing coal mine system capacity and it can guide coal mine practical practice.
机译:在检查生产能力的过程中,煤矿在生产系统或生产过程的某些部分具有过剩的生产能力,造成不必要的资源浪费;因此,优化浪费更多资源的煤矿生产系统的生产能力至关重要。为了解决这个问题,本文提出采用价值工程的方法对煤矿生产系统产能优化方案的成本,功能和价值进行估算,建立专家选择模型和煤矿生产系统产能优化模型,拿并分析了一个例子。结果表明,价值工程方法适用于优化煤矿系统产能,可以指导煤矿实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号