首页> 外文会议>Proceedings of the 2nd international symposium on Asia urban geoengineering >Evaluate the Impact on Adjacent MRT Station from Shield Tunneling by Numerical Analysis and Risk Management - Taking Taipei MRT Circular Line for Example
【24h】

Evaluate the Impact on Adjacent MRT Station from Shield Tunneling by Numerical Analysis and Risk Management - Taking Taipei MRT Circular Line for Example

机译:数值分析与风险管理评价盾构隧道对邻近捷运站的影响-以台北捷运线为例

获取原文
获取原文并翻译 | 示例

摘要

The first and second phase of Taipei Mass Rapid Transit (MRT) networks were operated now, and the additional routes were approved under design and construction. Although the developed MRT network provides great convenience to passengers, the planned new routes and stations usually overlap the operated ones. Therefore, the complexity and difficulty of design and analysis are gradually increased, and the geotechnical analysis tools should also be improved. In this project, risk identification and rating are carried out at first to realize the risk which might happen at each construction schedule. The strategies in accordance with each risk item are figured out at the design stage to mitigate the risk as much as possible. Hence, the numerical analysis (1-D, 2-D, 3-D) follows the strategy suggestions to simulate whether the effect of these risk strategies is enough or not. The feedback database of previous projects from the in-situ monitoring results could provide some basis for numerical analysis to assume the suitable parameter. Therefore, the analysis results could simulate the actual condition closer, and the analysis results should satisfy the related standard demands. For monitoring the safety of the operation station at all times, automatic monitoring system is set up to monitor the deformation immediately during the whole life cycle. The major goal is that "Prevent in design. Manage in construction. Monitor after completing", and the passengers' safety could be ensured under constructing the new routes. The evaluation and analysis of the impact on the existing stations from the nearby constructions were discussed in this study, and the conclusions could provide some suggestions for the design and risk management.
机译:台北捷运(MRT)网络的第一和第二阶段现已开始运营,其他路线已获得设计和建造的批准。尽管发达的捷运网络为乘客提供了极大的便利,但计划中的新路线和车站通常与运营的路线和车站重叠。因此,设计和分析的复杂性和难度逐渐增加,岩土分析工具也应得到改进。在该项目中,首先进行风险识别和评估,以了解在每个施工进度中可能发生的风险。在设计阶段就应根据每种风险项目制定相应的策略,以尽可能降低风险。因此,数值分析(1-D,2-D,3-D)遵循策略建议,以模拟这些风险策略的效果是否足够。来自现场监测结果的先前项目的反馈数据库可以为数值分析提供合适的参数提供一些依据。因此,分析结果可以更精确地模拟实际情况,并且分析结果应满足相关的标准要求。为了始终监视操作站的安全,设置了自动监视系统以在整个生命周期中立即监视变形。其主要目标是“防止设计,管理,施工,完工后监控”,在建设新路线的过程中可以确保乘客的安全。讨论了对附近建筑对现有车站的影响的评估和分析,其结论可为设计和风险管理提供一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号